Blowing MachineMaking MachineSlitterCutting MachinePressesGranulatorCut feeder seriesTransparent film packaging mWinder, winding machinePlastic Crusher SeriesPlastic Banliao SeriesTo bag packing machineCast film, stretch film machFeeding machine, suction macFolding MachineStar Flower MachineLaminating machineGassho machine, seizure of gBubble film machine, air bubSheet machine, cup making maFilm blowing machine, bag maPlastic film blowing machineGift paper, wallpaper, wallp
 
News
Making Machine specification operating standards (for reference only)
People living in production to use a wide variety of plastic bags, woven bags, paper bags, so the usage of bag making machine is also quite large, for a variety of bag processing factories, to improve production efficiency, safety precautions risk, the correct specification of the operational use bag making machine is a must, the following is Tianyuan Machinery Company finishing bag machine equipment operating standards for reference:
Acts to regulate the operation of the operator: 1. Purpose
2 Range: Making Machine
3 Job content:
3.1 mental state:
Good work attitude adjustment before 3.1.1, have a good mental state, emotional stability, energetic, comfortably into the shop. Ensure safe, efficient, according to the quality, quantity, time to complete production tasks.
3.1.2 coat neatly, leaving hair without rings, bracelets, do not wear vests, shorts. Otherwise, to persuade them to correct and then into the workshop; has entered the workshop were to make it undergo to correct after induction. Incorrigible who terminate labor contracts.
3.2 labor discipline:
3.2.1 to work on time, are not allowed to be late and leave early, late and leave early, are not allowed to leave work an hour ago.
3.2.2 work sleep deprivation, dozing, accumulated more than three times, to terminate labor contracts.
Do loud noises within 3.2.3 workshop, eat snacks, off-site, string post, chat, jokes, slapstick. Three times within a month, the termination of the labor contract.
3.2.4 leave must fulfill leave procedures, write written request for leave, signed by workshop director agrees to pay production manager approval before leaving. Something must be declared in advance, or find someone to replace. Except in special circumstances, may not leave the phone, take along false.
3.2.5 The non-unit personnel, employees do not work in this workshop are not allowed to enter the shop, into the workshop of approved visitors, accompanied by plant leadership, led the workshop director, ordered into the shop, not affecting production. Probation officers entered the shop, brought by the workshop leader.
3.3 Preparation before boot:
3.3.1 The operator must check in before starting voltage of the device is normal, whether the debris or surrounding equipment and production unrelated things.
3.2.2 Carefully read the notice of production tasks, process orders; and with reference to process a single request to receive packaging materials and auxiliary materials production of the orders.
3.4 Production debugging:
3.4.1 According to process a single request, with a hydraulic car will need to install a central location bag substrate material in the shaft, and the shaft with a pneumatic gun to the inflatable inflated. Start pneumatic lifting device to the substrate into a suitable discharge location. Check this volume increase of the substrate with or without product defects and, if you must keep in mind the joint position, so that the bag's in the process of removing the defective product.
3.4.2 correct threading.
3.4.3 be wearing material has been completed, in accordance with the requirements of the process, the replacement of the product in line with the requirements of sealing tool.
3.4.4 turned the host power supply, cooling water, static elimination device and compressed gas source, according to the technical requirements set by the user interface corresponding sealing knife suitable temperature.
3.4.5 Setting tension discharge pressure, input automatically.
3.4.6 points expected by the button, the material to process single-cut position requirements and adjust the length of the bag electric eye tracking sensitivity. For punching, punching round holes adjust the position of the mouth and tear.
3.4.7 through man-machine interface, a single request in accordance with the process set bag size, bag feed rate, the ratio of the number of product tips and sealed.
3.5 begin production:
3.5.1 When everything is ready, start the machine starts bag.
3.3.2 initial batch of devices should be examined in detail the product to the finished length error bag, seal strength, and may affect product quality testing.
3.5.3 The qualified products into the finished box, in the finished product outside the box labeled certificate after sealed with tape storage.
3.5.4 When the operation of the machine, always concerned about the change of equipment, such as: temperature, pressure. And to keep the surface clean sanitation equipment, prohibited the waste piled everywhere, from work 30 minutes ago, by an assistant around the equipment will be cleaned, otherwise it does not have the right to take over the succession.
3.5.5 Equipment set failure occurs, especially electrical fault, it is timely to reflect squad bag, fill out the "equipment failure repair orders" and notify maintenance personnel.
3.6 Shutdown:
3.6.1 orders after the end of downtime, the site must be cleaned, the end product has been boxed, waiting for the next batch of products.
3.6.3 bag making machine should be closed down more than one shift of water, electricity, gas.
3.7 Production process safe method of operation
3.7.1 High temperature gloves must be worn when replacing the sealing knife, be careful when installing sealing to prevent damage or injured by falling knife.
3.7.2 In the punching device operation, prohibit a hand to clean up the work area stickers to clean up must be shut down.
3.7.3 bag during bag system, the proper use of dielectric knife blade to avoid scratching medium.
3.7.4 When using manual forklifts, must act strictly in accordance with operating instructions manual forklift.
 
 Copyright © 2014 Ruian Tianyuan Plastic Packaging Machinery Co.,ltd All Rights Reserved.
99精品在线观看 | 91嫩草精品少妇高潮喷水漫画 | 亚洲无码熟妻国产 | 亚洲不卡一区二区免费 | 久久久久久久久久成人永久免费视频 | 亚洲乱熟女综合一区二区三区 | 一级婬片120分钟试看 | 尤物网址在线观看 | 国产99在线观看 | 搡老岳熟女国产熟妇 | av在线成人网诂 | 亚洲国产精品乱码一区二区三区 | 免费观看国产在线视频不卡 | 麻豆视屏一起做免费看 | 久久影院午夜理论片无码 | 亚洲成人网络久久 | 嫩喷小白浆高潮潮喷视频 | 四川最大BBBBBBBBB | 中文字幕亚洲视频在线观看 | 黄色视频网站一区二区 | 极品少妇扒粉嫩小泬视频麻豆 | 亚一洲一侵犯一区二区三区 | 强奸美女网站在线观看 | 91精品国产一区二区三竹菊影视 | 亚洲最大色综合成人AV | 97国产精东麻豆人妻电影 | 又长又大欧美又黄一区二区三区 | 精品久久人妻无码网站一区网 | 亚洲女人天堂成人AV在线 | 亚洲欧美日韩一区二区 | 国产乱人妻精品秘 入口 | 91在线无码精品秘 入口三人 | av在线播放一区二区 | 熟女视频在线一二三区 | 亚洲国产成人精品无码电彤 | 女人18片毛片60分钟 | 久久无码潮喷A片无码高潮四季 | 日本少妇无码又粗又大 | 国产AV一级网站 | 最新日韩毛片亚洲另类毛片日韩 | 波多野结衣乳巨码无在线观看波 |